User Tools

Site Tools


mobil:assemblies:structures:tour

Tour

assembly structure visibility

A stacked tube-and-connector tower — height and visibility from the same 1,33 m module. Banners, light or a lookout, depending on what you mount on it.

  • Type: Structure
  • Status: In use
  • Primary function: visibility / height / signal

1. At a glance

Specification Value
Footprint 3,99 x 3,99 m
Height 3,99 m
Volume 63,44 m3
Total weight 114,9 kg
Assembly time . (to define)
People needed . (to define)
Tools Hammer (optional, for pins)

2. 3D model & steps

If the model doesn't load, open it in a new tab.

3. Parts (bill of materials)

Everything you need to build one tour. All tubes diameter 50 x 2 mm wall. Click a part for specs and handling.

Part Qty Spec
Straight tube 40 1329,4 mm
Diagonal tube (45) 30 1880,1 mm
T-connector 48 2 per connector node
X-connector 24 1 per connector node
Locking pin . 1 per tube-connector joint
Panel 12 1329,4 x 1329,4 mm (panel type to confirm)
  • Connector nodes: 24 (each = 2x T + 1x X)
  • Tubes total: 70 - tube length: 109,58 m
  • Tube weight: 89,2 kg - connector weight: 25,7 kg - total: 114,9 kg

Source: MoBil builder. Locking-pin count and panel type to confirm.

4. Assembly

The tour is stacked from connector nodes. Each node = the connector assembly (2x T + 1x X), joined by tubes. Built flat, then tilted upright.

  1. Lay out the base level. Three squares side by side on the ground; join the nodes with straight tubes.
  2. Add the verticals. One straight tube into each ground node, pointing up; connect.
  3. Close the top surface. Cap with straight tubes.
  4. Add panels. Mount square panels where wanted.
  5. Tilt 90 and add the base. Stand the structure upright on its hinge, then add the base for stability.

Each step maps to a stage in the viewer above.

5. Safety & correct use

Build safety

  • Pinch points at every connector - keep fingers clear when seating joints.
  • Don't hammer pins with the frame unsupported; seat the joint by hand first.
  • Tilting a tall frame upright needs enough hands - never lift it short-handed.

Use & load limits

  • Max vertical load (stage/roof): . kg (to define / test)
  • Do not climb the frame unless rated and ballasted.
  • Wind: above . km/h, remove banners and ballast or take down. (define - tall, wind-critical)
  • Never leave a tall configuration up unattended in changing weather.

Ballast / anchoring

  • Footprint anchoring with water weights at the base corners - mandatory for any raised or sail-bearing configuration.
  • Ropes to fixed points where available.
  • Minimum ballast: . kg per corner (define per configuration).

6. Takedown & storage

  1. Remove add-ons and ballast first.
  2. Tilt the frame back down flat before breaking joints.
  3. Pull top pins, lift off top surface.
  4. Pull verticals.
  5. Break the base levels. Nodes can stay assembled for next time, or break to flat-pack.
  • Packs into: normal bike trailer (tubes + euroboxes for connectors).
  • Store dry. Check pins aren't bent before repacking.

7. Compatible add-ons

What this tour accepts:

8. Media & credits

  • Photos - Drawings - Exploded diagram
  • Linked: Connector (the core joint)

Designed by . - Year . - Iteration . - Last updated: .

mobil/assemblies/structures/tour.txt · Last modified: by 127.0.0.1