Cube
assembly structure base
The basic building block of the MoBil system — a 1,33 m aluminium tube-and-connector frame. Support, visibility, shelter or stage, depending on what you mount on it.
1. At a glance
| Specification | Value |
| Footprint | 1,33 x 1,33 m |
| Height | 1,33 m |
| Volume | 2,35 m3 |
| Total weight | 30,7 kg |
| Assembly time | 1 person 10 min - 2 people 5 min |
| People needed | 1-2 |
| Tools | Hammer (optional, for pins) |
2. 3D model & steps
3. Parts (bill of materials)
Everything you need to build one cube. All tubes diameter 50 x 2 mm wall. Click a part for specs and handling.
Connector nodes: 8 (each = 2x T + 1x X)
Tubes total: 18 - tube length: 27,23 m
Tube weight: 22,2 kg - connector weight: 8,6 kg - total: 30,7 kg
Source: MoBil builder. Locking-pin count to confirm.
4. Assembly
The cube is built from 8 corner nodes. Each node = the connector assembly (2x T + 1x X), joined by tubes.
Build the 8 connector nodes. For each: take one T-connector upright (slot up), slide a second T-connector over it downward, slide an X-connector to the middle, rotate to lock.
Make the bottom square. Join 4 nodes with 4 straight tubes. Pin each joint.
Add the 4 uprights. One straight tube into each bottom node, pointing up.
Close the top square. 4 nodes + 4 straight tubes on top of the uprights. Pin.
Brace with diagonals. 6 diagonal tubes (45) for load and wind stability. Pin.
Each step maps to a stage in the viewer above.
5. Safety & correct use
Build safety
Use & load limits
Max vertical load (stage/roof): . kg (to define / test)
Do not climb the frame unless rated and ballasted.
Wind: above . km/h, remove banners/roof and ballast or take down. (define)
Never leave a tall configuration up unattended in changing weather.
Ballast / anchoring
6. Takedown & storage
Remove add-ons and ballast first.
Pull top pins, lift off top square.
Pull uprights.
Break bottom square.
Nodes can stay assembled for next time, or break to flat-pack.
7. Compatible add-ons
Designed by . - Year . - Iteration . - Last updated: .