User Tools

Site Tools


mobil:assemblies:structures:arc

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
mobil:assemblies:structures:arc [2026/06/23 09:03] – created - external edit 127.0.0.1mobil:assemblies:structures:arc [2026/06/23 11:18] (current) yannick
Line 16: Line 16:
 | Volume             | 42,29 m3       | | Volume             | 42,29 m3       |
 | Total weight       | 125,0 kg       | | Total weight       | 125,0 kg       |
-| Assembly time      | . //(to define)// +| Assembly time      | 1h 
-| People needed      | . //(to define)// |+| People needed      | |
 | Tools              | Hammer (optional, for pins) | | Tools              | Hammer (optional, for pins) |
  
Line 73: Line 73:
   * Footprint anchoring with [[mobil:parts:accessories:water_weight|water weights]] at the base corners for any raised or sail-bearing configuration.   * Footprint anchoring with [[mobil:parts:accessories:water_weight|water weights]] at the base corners for any raised or sail-bearing configuration.
   * [[mobil:parts:accessories:ropes|Ropes]] to fixed points where available.   * [[mobil:parts:accessories:ropes|Ropes]] to fixed points where available.
-  * Minimum ballast: kg per corner //(define per configuration)//.+  * Minimum ballast: 15 kg per corner ont he ground.
  
 ===== 6. Takedown & storage ===== ===== 6. Takedown & storage =====
mobil/assemblies/structures/arc.1782198214.txt.gz · Last modified: by 127.0.0.1